Notices and building work

Does planning permission cover party wall matters?

Planning permission, building regulations and the Party Wall etc. Act 1996 are separate. Depending on your proposal, you may still need to give a party wall notice after receiving planning permission.

Do all extensions and loft conversions need a notice?

It depends on the details. A loft conversion may involve work to a shared wall, and an extension may involve a new boundary wall or excavations near neighbouring foundations. Start with the drawings, location and foundation depth.

How much notice do I need to give?

Party structure notices generally require at least two months. Applicable boundary-wall and excavation notices generally require at least one month. Check the notice type before relying on a particular date.

Can I use a GOV.UK template?

The government booklet includes example letters. Check which notice fits the works, who must receive it and whether supporting plans or sections are required before serving it.

Responses, surveyors and records

What if my neighbour does not reply?

For party structure and excavation notices, a dispute is generally deemed to arise if written consent is not given within 14 days. Different rules apply to a proposed wall astride the boundary. If a dispute has arisen, a separate written request can start a 10-day period to appoint a surveyor. See the response options.

Can we both agree to use one surveyor?

Where the Act’s dispute resolution process applies, both owners can agree to appoint a single surveyor. The owners can also appoint separate surveyors.

What is the difference between an award and a schedule of condition?

An award determines matters under the Act, including conditions on how relevant work may be carried out. A schedule records existing conditions before work starts and can be included with an award.

Who normally pays for the award?

For work carried out for the building owner’s benefit, the building owner usually pays the reasonable surveyors’ costs. In some circumstances the costs can be apportioned differently, as determined in the award.

When plans or circumstances change

What if work has already started and I haven’t received a notice?

Ask for details of the work, keep dated photos and copies of correspondence, and seek prompt advice if you think a notice was needed. See what to do if no notice arrived.

What if the design changes after notice was served?

Keep the original and revised drawings together and ask for the changes to be reviewed before relying on the original notice or award. Changes to the boundary wall, foundations or work to a shared wall can affect what the process needs to cover.

Further reading